To solve the problem of incorrect permissions after a REQUEST TO PASS DANGER operation, I had to make a change, in addition to signaling in some areas of the route, even to the signals pack. ... continue reading »
Route To-Ba – End of the year update
For all who are waiting for publication, the route is in theory ready. The installer is finished, the manual is almost finished, the packs are all finished.
There remains a problem of signal behaviour that I’m trying to solve and that I have not yet solved, and a couple of changes of catenary not properly ... continue reading »
New assets published
New assets pack have been published. ... continue reading »
New Section of the To-Ba route
Since it was asked by some friends of Rotabili Italiani, in recent days I have realized the extension of the route from Bardonecchia to the Modane station, this last built partially. ... continue reading »
To-Ba New Beta 5 release
The new Beta release of the route with all the optimizations and changes that was become necessary after the publication of the beta 4 is under testing.
I would say that the situation seems to have definitely improved, and the critical points of the previous version eliminated. In general, the route is more fluid, occupies much less resources in critical areas of the Turin hub, and the landscape has been optimized in some areas that seemed unfinished from the train cabin. ... continue reading »
New assets
New assets that support the Turin-Bardonecchia route have been included in the projects section. ... continue reading »
Pack Building
The new Release of the pack Buildings is available for download here.
The new contains some additional models created during the cleaning phase of the Porta Nuova and Lingotto station to reduce the demand for memory and graphical resources. ... continue reading »
RW and memory usage III
After I discovered the two main reasons of memory problems and where to investigate, I finally worked on several factors. The Orbassano yard, and the stations of Porta Nuova and Lingotto have a lot of tracks, that in simulation are maybe useless, in the sense that they are hardly necessary even for a complex scenario. […] ... continue reading »
SFM Torino – First Movie
As anticipated in the post “And then?” the first part of the extension of the Torino-Bardonecchia route is almost completed. A long testing movie of the new extension can be found here in the Video section. ... continue reading »
New Static Rolling Material Pack
New Static Rolling Material Pack available for download. You can find it here.
The pack incudes a number of low poly models to be placed in large yars or stations to make the experience more realistic, without heavily affecting system resources and performance. ... continue reading »